Items where Subject is "TK Electrical engineering. Electronics Nuclear engineering"

Group by: Creators | Item Type
Jump to: A | H | J | M | N | V
Number of items at this level: 9.

A

Adrian, Maulana (2024) ANALISA IDENTIFIKASI PENGARUH KEGAGALAN PROYEK KONSTRUKSI DI KAWASAN WISATA LOMBOK. Other thesis, Universitas Islam Al-Azhar.

H

Hamzani Surgi, Mufti (2024) ANALISA SISA MATERIAL (LIMBAH KONSTRUKSI) PADA PROYEK KONSTRUKSI DENGAN METODE PARETO DAN FISHBONE DIAGRAM. Other thesis, Univarsitas Islam Al-Azhar.

Hari, Wahyudi (2024) MITIGASI PENANGANAN BENCANA TANAH LONGSOR DI KECAMATAN TANJUNG KABUPATEN LOMBOK UTARA DENGAN METODE UJI VALIDASI DAN RELIABILITAS MENGGUNAKAN SOFTWARE SPSS. Other thesis, Univarsitas Islam Al-Azhar.

J

Jouperry, Antoni (2024) ANALISIS PERHITUNGAN VOLUME PEKERJAAN MENGGUNAKAN PEMODELAN 3D SKETCHUP. Other thesis, Universitas Islam Al-Azhar.

M

M. Jihat, Jihat (2024) ANALISA SISA MATERIAL (LIMBAH KONSTRUKSI) PADA PROYEK KONSTRUKSI DENGAN METODE PARETO DAN FISHBONE DIAGRAM. Other thesis, Univarsitas Islam Al-Azhar.

Mahli, Ahmad (2024) ANALISIS PENGARUH PEMANFAATAN PASIR PANTAI MAPAK SEKARBELA KOTA MATARAM PADA CAMPURAN ASPAL AC-WC DENGAN MARSHALL TEST. Other thesis, Universitas Islam Al-Azhar.

Masnan, Sujana (2024) ANALISIS KARAKTERISTIK CURAH HUJAN DENGAN MENGGUNAKAN KLASIFIKASI SCHMIDT-FERGUSON DI KAWASAN EKONOMI KHUSUS MANDALIKA. Other thesis, Universitas Islam Al-Azhar.

N

Niswatun, Huriah (2024) ANALISIS ASPEK PENILAIAN DAN KINERJA PENERAPAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONSTRUKSI. Other thesis, Universitas Islam Al-Azhar.

V

Vina Yulia, Anggraeni (2024) ANALISIS POTENSI KETERSEDIAAN AIR DENGAN METODE PEMANENAN AIR HUJAN (STUDI KASUS KAMPUS UNIVERSITAS ISLAM AL – AZHAR MATARAM). Other thesis, Universitas Islam Al-Azhar.

This list was generated on Fri Dec 27 07:19:42 2024 WITA.